Image description

RAMBIGAS NIGERIA LIMITED

RC 327988

Environmental  Consultancy  Services  and  Regulatory  Management

Image description

Our Job Profile

Our Job Profile

      Participated  in  the  setting  up  of  Ministry  of  Environment in  Ogun  State  (2000 - 2003)

      Coordinating  of  Environmental  Management  Fund  in  Ogun  State.  (2005 - date)

 

(i)        Environmental  Impact  Assessment  (EIA):

  • Glasspack Limited Container Glass (bottles) Factory, OPIC, Agbara-Igbesa, Ogun State (on-going)
  • Flexipack Limited Flexible Plastic Factory, OPIC, Agbara-Igbesa, Ogun State (on-going)
  • Nestle Nigeria Abaji Green Field Water Factory, Abuja  (2015)
  • Nestle Maggi Culinary Factory, Sagamu (Internal Consultants) – (2010)

 

(ii)        Environmental  Audit  Report (EAR):

  • Nampak Bevcan Nigeria Plant, (2017,on-going)
  • Lotus  Plastics  Factory,   (2016)
  • Globus  Food  Processing  Factory, (2015)
  • Cometstar Cable Manufacturing Limited,(2014)
  • Nestle Nig  Plc (Agbara  Factory) (2009)
  • Lotus  Plastics  Factory,   (2008)

 

(iii)       Environmental  Implication  Studies (EIS):

  • Ajeast Nigeria Limited New Line Expansion (on-going 2017)
  • Cometstar - Afrigas Air Separation Unit and CO2 Plant (on-going, 2017)
  • Nestle Distribution Center Extension, Agbara (2017)
  • Strongpack Limited OPIC, Agbara-Igbesa (2016)
  • Ajeast Nigeria Limited, Agbara (2014)
  • Nestle  Waste  Water  Treatment  Plant  Upgrading, Agbara (2014)
  • Nestle  7.6MW , Tri-generation  Independent  Power   Plant, Agbara) (2012)
  • Nestle  Cereal  Plant Extension, Agbara (2012)
  • Cometstar Manufacturing  Company’s Waste Copper Wire  Recycling  Plant,(2012)
  • Nestle New  Milo  Extract  Expansion Project, Agbara (2010)
  • Nestle Cereals  Miling  Plant  Facility  Expansion, Agbara (2010)
  • Nestle Deep Well and Warehouse Facility Expansion Project (2010)
  • Nigerian  German  Chemical – Intravenous Infusion Fluids and Eye Drops
  • Production facility Project (2010)
  • Nestle  Cereal  Milling  Plant  facility  Expansion, Agbara (2009)
  • Alucan  Packaging  Limited, OPIC Estate (2011)
  • Cometstar Manufacturing  Company Factory,  Agbara (2006)
  • Nestle  Waters Factory , Agbara,  (2005)
  • Nestle  Milo  Production  Facility  Expansion  Project, Agbara (2005)
  • Nestle  Cereal  Products  facility  Expansion  Project Agbara  (2005)

(iv)      Baseline Data Studies:  
Ecological  Baseline  Studies  for  Free Range  Farms  Limited (Abeokuta,  Ogun  State) (2012)
Nestle Biological Effluent Treatment Plant Baseline  Studies,  Flowergate  Sagamu (2011)
Nestle  Waste  Water  Treatment  Plant,  Baseline  Studies,  Agbara (2006)
 
(v)      Post - Impact  Environmental Assessment:
Post  Impact  Environmental Assessment  Evaluation  for  Nestle  7.6MW  Tri- Generation Independent  Power  Plant  Facility (Agbara,  2012)
 
(vi)      Waste  Management:

  • Disposal  of  Toxic  Oral  Suspension  for  GSK
  • Unilever  Product  Waste  Disposal( Burnt  Margarine)
  • Expired  Chemical Disposal for Nestle, Agbara  & Flowergate  factories  

 
(vii)      Permits & Licences:

  • NAFDAC  Permit  for  COLEK,  Farotti  Fragrances,  Servizi  Italliani  etc 
  • DPR  Permits  for  Nestle  factories, Agbara / Sagamu / Distribution Center & Alucan Packaging Limited factory

 

Image description

On duty at Stakeholders Forum for Nestle Trigeneration Power Plant Project

Image description

Sampling During Nestle Nigeria Abaji Greenfield Factory EIA Field Work (Wet Season) September, 2013.

Image description

Ecological Study: Field Operation

Image description

Ecological Study: Field Operation

Image description

Hydrology Hydrobiological Sampling